Safely arrived and installed Saturday 27 November.
Safely arrived and installed Saturday 27 November.

Safely arrived and installed Saturday 27 November.

Intermittently wet but clear drive up to Dieppe. Arrived nearly two hours early and got onto the ferry with no problems around 5 am. They only lifted the boot door quickly and didn’t need anything unloaded. Very rough crossing but survived without feeling too bad. No customs at all as we drove onto British soil so David needn’t have worried afterall.

Snowy start in Giltbrook but it was mainly melted when we arrived for a lovely meal with and dad at 1.30pm.

It was so cold that we decided to continue on by 3 pm despite David being very tired. Good job too as Sheffield had alot more snow so we unloaded the car and got the trailor in the garage before it was too late. Temperatures around 1 degree though!

First job was to help finish the puzzle so the table could be cleared for the next days mammoth party. Meanwhile Christy was peeling kilos of potatoes and preparing goodies. We didn’t manage too much puzzle before we hit the sack but Josh did manage to finish it in the early hours of the morning!

Leave a Reply

Your email address will not be published. Required fields are marked *